We execute your test procedure. Safe power-on, rails validation, console/bus checks, and a clear 1-page report.
Typical turn: 1-3 business days. NDA-friendly. Ship-in model, works nationwide. Current-limited power-up, rail measurements with scope screenshots, UART/I2C/SPI checks, firmware flash/provisioning, and photo evidence throughout.
Yes. We execute your TP verbatim and record evidence (scope screenshots, logs, photos). If anything is ambiguous, we pause and ask for clarification.
Yes. J-Tech LabWorks operates on a ship-in model and works with engineering teams nationwide. You ship boards and documentation, we do the work, and results come back fast.
Bring-up is limited to 24 VDC (typical 3 A). We don't perform battery-pack testing or hipot unless your TP provides explicit, approved steps.
A 1-page results summary PDF, plus a ZIP of scope PNGs, logs/CSVs, and photos. Boards are shipped back to you.
Send your TP and files using the form below, or email janderson@jtechlabworks.com.